
Vicolozano II industrial State
It's sale is managed by ADE Parques Tecnológicos y Empresariales and has two built-Performance Units and all distribution utilities and communication.
| Vicolozano II | |
|---|---|
| Industrial Land | 212.908 m2 | 
| Public holders | 36.878 m2 | 
| Green areas/Free slots | 119.262 m2 | 
| Infrastructure | 4.068 m2 | 
| Streets and parking facilities | 64.522 m2 | 
| TOTAL | 437.638 m2 | 
| Urban Parameters | Vicolozano II UA1 | Vicolozano II UA2 | 
|---|---|---|
| Buildability | Maxim 1,092 m2/m2 | INDI: Maxim 0,761 m2/m2 | 
| INDE: 0,7 m2/m2 | ||
| Occupation | 80% | INDI: 80% | 
| INDE: 60% | ||
| Setbacks | Minimum 5 m. to all boundaries | Minimum 5 m. to all boundaries (INDI/INDE) | 
| 0 m. if attached | 0 m. if attached (INDI) | |
| Maximum height | Production Industry 12 m. to front. | INDI: 12 m. to front, 17 m ridgepole | 
| 17 m. ridgepole, 3 floor (Down + 2) | INDE: 15 m. to front, 20 m. ridgepole, 3 floor (Down + 2) | 


Vicolozano III Commercial-Industrial Park
It's sale is managed by Ávila City Council and is currently developing, facilitating its adaptation to the needs demanded. Stresses spacious commercial use.
| Vicolozano III | |
|---|---|
| Industrial Land | 63.890 m2 | 
| Public holders | 8.839 m2 | 
| Green areas/Free slots | 11.040 m2 | 
| Streets and parking facilities | 26.375 m2 | 
| TOTAL | 110.144 m2 | 
| Urban Parameters | Vicolozano III | 
|---|---|
| Buildability index | 0,40 m2/m2 | 
| Surface SG | 15.060 m2 | 
| Authorized uses | INDI/INDE (SER/PK/SP compatible) |